Specialised Conference on Industry 4.0 (Visuartech)
Specialised Conference on Industry 4.0 (Visuartech)
Specialised Conference on Industry 4.0 (Visuartech)
Civil Works for Foundations at the Lime Distribution Plant, Noviciado (Chile)
Modelado y Delineación Industrial Cubierta Balsa Pulmon 456-S-1-BA, (Repsol-Tarragona)
Audit, Improvement Proposal and Revit Modelling of MEP Installations – GHESA Hospital, Al Ain (United Arab Emirates)
Design and Calculation of Foundations for Stacker-Reclaimers (TST1, TST2, TPR1 and TPR2), Project T014, Zouérat, Mauritania
CATIA 3D Modelling and 2D Drawing Drafting for the Installation of a Cooling System for a Particle Accelerator (Japan)
Digitisation of Commissioning Certificates (Murcia Area) and Legalisation of Transformer Substations without Commissioning Certificates (Murcia-Alicante Area)
Fire Protection Project for the Nitroglycerine and Nitrocellulose Storage Warehouse, EXPAL, Murcia
Basic and Detailed Engineering for the construction of a seawater desalination plant based on reverse osmosis, intended to supply fire-fighting water consumption at the ENAGÁS Project facilities in Barcelona.
Basic and Detail Engineering for the Construction of a Desalination Plant based on seawater reverse osmosis. Enagás Barcelona Project. Basic and Detailed Engineering for the construction of a seawater desalination plant based on reverse osmosis. ENAGÁS Barcelona Project.
Technical support for supervision tasks, verification and assurance of installation in accordance with the project and standards. On-site problem-solving. Monitoring compliance with the construction schedule for the Guelb II Mine Project in the electrical discipline.
Technical support for supervision works in the electrical field, verification and assurance of installation in accordance with the project and standards, on-site problem-solving, and monitoring compliance with the construction schedule for the Guelb II Mine Project.Technical support for supervision works in the electrical field, verification and assurance of installation in accordance with the project and standards, on-site problem-solving, and monitoring compliance with the construction schedule for the Guelb II Mine Project.
IDEA utiliza cookies propias y de terceros para analizar tus hábitos de navegación, obtener información estadística y mostrarte contenidos relacionados.