Design and Calculation of Foundations for Stacker-Reclaimers (TST1, TST2, TPR1 and TPR2), Project T014, Zouérat, Mauritania
Design and Calculation of Foundations for Stacker-Reclaimers (TST1, TST2, TPR1 and TPR2), Project T014, Zouérat, Mauritania
Design and Calculation of Foundations for Stacker-Reclaimers (TST1, TST2, TPR1 and TPR2), Project T014, Zouérat, Mauritania
Basic and Detailed Engineering for the construction of a seawater desalination plant based on reverse osmosis, intended to supply fire-fighting water consumption at the ENAGÁS Project facilities in Barcelona.
Basic and Detail Engineering for the Construction of a Desalination Plant based on seawater reverse osmosis. Enagás Barcelona Project. Basic and Detailed Engineering for the construction of a seawater desalination plant based on reverse osmosis. ENAGÁS Barcelona Project.
Preparation of the Detailed Engineering for the relocation of the cryogenic nitrogen supply plant and for the new autonomous nitrogen generation system at the LNG Regasification Plant (Huelva)
IDEA utiliza cookies propias y de terceros para analizar tus hábitos de navegación, obtener información estadística y mostrarte contenidos relacionados.