
Project
Transfer towers in Russia

Client
TAIM WESER

Location
Tumen, Rusia

Sector
Mining

Service
Engineering

Software
ROBOT, TEKLA, AUTOCAD, LUMION

Year
2014

Transfer towers in Russia
On this occasion, the project involved the construction of two transfer towers and a storage building, including a silo with three discharge spouts for the coke line for the Antipinsky refinery in Russia.
Phases
- Engineering for the design and calculation of the metallic structure
- Calculation and design of bolted joints
- Preparation of calculation reports justifying the designs and calculations of the metallic structure
- Metal structure drawings for workshop
- Assembly drawings of steel structure
- Detailed measurements
Objetives
In order to meet our client’s needs, we have performed the design, calculation and detail engineering for the metal structure:
- 2 transfer towers, weighing 17 t and 22 t
- 1 storage building with silo, weighing 124 t
¿Buscas una ingeniería multidisciplinar pionera en Industria 4.0, y especializada en metodología BIM?
¿Buscas una ingeniería multidisciplinar pionera en Industria 4.0, y especializada en metodología BIM?























