Immersive Technologies | Augmented reality | EDAR | HiDROGEA
TD project for the realization of an APP with Augmented Reality (AR), with which HiDROGEA has a new way of showing its facilities
TD project for the realization of an APP with Augmented Reality (AR), with which HiDROGEA has a new way of showing its facilities
TD project for the realization of an APP with Augmented Reality (AR), with which HiDROGEA has a new way of showing its facilities
Industry 4.0 project. Development of multidisciplinary and digitalization works in a petrochemical plant for our client ILBOC.
EPC Project for Maquiaridos in Gabon, for the construction of the metallic structures of the three Transfer Towers in the mining exploitation.
ProjectCombined Cycle Power Plant ClientGrupo Cobra. LocationIvory Coast. SectorEnergy. ServiceEPC – Metallic Structure. Quick facts:1.875 TN. Software:TEKLA, IDEA STATICA, TRIMBLE CONNECT, MICROSOFT PROJECT. Promoter:Azito Energy. Year2020. Grupo Cobra, a world leader in the industrial maintenance, engineering and installation of infrastructures, has chosen IDEA for the development of a new EPC project to manufacture metallic structures…
Navantia hires IDEA Ingenieía to carry out the pre-selection of candidates to renew the workforce in its different centers in Spain.
IDEA Engineering has successfully completed for URBINCASA the electrical installation and legalization project for Residencial Los Flamencos.
Multidisciplinary engineering works for the expansion of one of the bauxite extraction mining operations in Guinea, belonging to the Copisa Group.
Industry 4.0 Project. Development of multidisciplinary and digitalization works in a petrochemical plant for our client ILBOC.
Phase I of a multidisciplinary engineering project for a new 15,7580.65 m2 biotechnology plant in Alhama de Murcia, Spain.
IDEA utiliza cookies propias y de terceros para analizar tus hábitos de navegación, obtener información estadística y mostrarte contenidos relacionados.