Project
Waste treatment plant

Client
Sertego

Location
Spain, Valencia

Sector
Industrial – Water

Service
Engineering.

Disciplines
Mechanical, piping and civil.

Software
CADWorx, Pipe Flow, AutoCad

Year
2021

Investment
12,5 M€

New waste treatment plant
The Final Treatment Plant for Liquid Waste generated by ships (Annex 1 of the Marpol 73/78 Convention) and similar will have a total storage capacity of 8,200 m3 distributed according to the product or by-product generated for a total of 21 tanks.
In this project, advanced basic engineering services were provided for the construction of a new Sertego industrial complex for the treatment of Marpol industrial waste.
This new plant will be located in the Port of Valencia – Xità, in Area 5 – Sub-area B, with good access and communication within the port.
The final liquid waste treatment plant will have a total storage capacity of 8,200 m3
Scope:
The final outcome of the Advanced Basic Engineering includes the work required to define the project and its processes with sufficient quality, thus generating the engineering documentation with sufficient depth to be able to subsequently contract the different mechanical lots, detail engineering, manufacturing, construction and support, with a margin of error of ±10% with respect to the actual final measurements.
Creating a 3D design of the entire plant in this way helps to minimise any future interferences or problems that could occur.
The project lasted five months and involved the disciplines of piping, mechanics, structures, and instrumentation and control.
Project phases
- Analysis of client needs
- Study and initial approach to the process
- Defining the process through P&IDs
- Risk and operability study (HAZOP)
- Mechanical design of facilities using BIM technology
- Design of the necessary instrumentation installations.
- Development of documentation (drawings, lists, specifications etc)
- Technical assistance for procurement management.

Once again, IDEA has carried out a multidisciplinary project in which the whole team has participated in order to obtain the best results. This is the third Sertego plant in which we have successfully participated,acquiring greater value in each one of them and thus strengthening ties with our client.
Click here to see the first waste treatment plant that we built for Sertego.
Much more than engineering.
Much more than engineering.