Project
Remodelling of the Cerámica Football Stadium

Client
ESTRUCTURAS METÁLICAS LYMSA

Location
Castelló de la Plana, Spain.

Service
Engineering

Sector
Building & urban planning

Year
2022

Duration
6 meses

Software
IDEASTATICA

Investment
35 M€

Refurbishment of the Cerámica Football Stadium
Refurbishment of the Cerámica Football Stadium, with an investment of around 35 million euros, with 2,400 tons of steel, 12,900 m2 of roof and 8,700 m2 of façade, awarded to the local construction company ALVIBEN OBRAS, S.L. The duration of the project was six months.
The construction of the new stands in the corner, between the Preference and South End stands, thus achieving the complete enclosure of the stadium. The construction of the roofing of the North stand. Coverage of the entire capacity of the stadium.
Work performed
Design and calculation of the bolted and welded joints of the North Stand metal structure (1,500 tonnes) of the Cerámica Villarreal Football Club, with the aim of refurbishing the football stadium for the centenary.
Using IDEASTATICA software, which allows the design of all types of welded or bolted connections, bracing and complex joints.
For IDEA it has been a privilege to participate in this great project and to have contributed to its final success. We would like to thank LYMSA for the trust placed in our company for the design and calculation of the bolted and welded joints.
Much more than engineering.