EPC for detail engineering
IDEA Ingeniería has carried out the manufacture and supply of eight different metallic structures (Pumps Platform and Piping Rack of the Pyrolysis Unit No. 1, Valves Handling Platform for the replacement of large devices at the Plant of Olefins, Transformers and Condensers’ Cabin of the Prefabricated Substation, Compressors Building of the Ethylene Unit No. 1, 3rd Prefabricated Substation and PSV Platform) in the industrial complex of Repsol Tarragona.
In this project, by means of its EPC service, IDEA has carried out the 3D Engineering Modelling and Delimitation, Procurement, Manufacturing, Surface Treatment Application and on-site Supply works for eight structures.
The Repsol Industrial Complex in Tarragona will begin a scheduled shutdown, taking safety as a top priority. The shutdown will occur in the main chemical plants: Butadiene, Polyolefins and Olefins.
Scope
-
Detailed engineering to obtain the assembly and manufacturing plans for the eight different structures, as well as the secondary structure (handrails and vertical staircases).
-
Manufacture of the metallic structure and application of the surface treatment of both the main and secondary structure, stringers and handrails.
-
Supply of screws, electrowelded mesh and cover plates.
-
Quality control in the workshop and drafting of the quality dossier.
-
Performance of the finished material load control .
-
Shipment of the material to the site.
The total weight of the eight steel structures, including the entire secondary structure and the electrowelded mesh, is approximately 42 tonnes.
Carrying out detail engineering to obtain the manufacturing and assembly plans for the three different structures, as well as the secondary structure (handrails and vertical ladders). Construction of the metal structure and application of the surface treatment for both the main and secondary structure, stringers and handrails.
Much more than engineering.
Much more than engineering.