Project description:
- The Al Ain New Hospital project, including the main hospital, building refurbishment works, the Administrative Building, Kindergarten, Mosque, Logistics, Utility Centre, Tunnel Supply, Mortuary and Primary Substation, has been designed in accordance with international standards
- The cooling energy load for the entire site is approximately 49.35 MW.
- The heating energy demand for hot water (for domestic hot water and sanitary purposes) is approximately 6.36 MW.
- The electrical power supply from the public grid has a total connected electrical load of approximately 39.17 MW.
- The total built area is 320,000 m² in Al Ain, United Arab Emirates.
Client | GHESA